Danone Nutrica
Boiler House
Upgrade Works

Supply and installation of new aluminium glazed screen c/w 1800 wide x 2400 high insulated roller shutter door centrally located. Removal of existing chequer plate and replace with new flowforge and pfc supporting structure. Cleaning out of existing open trench duct systems prior to installation of flowforge grating. Demolition, removal, and disposal of existing externally located control room.